Current Projects--Bridge Engineering Center, Iowa State University
Current Projects divider

See also presentations given by BEC staff and students.

End Date Title
Nov 30, 2018 Laboratory and Field Evaluation of an Alternative UHPC Mix and an Associated UHPC Bridge
Aug 31, 2018 Autonomous Sensing Skin for Detection and Localization of Fatigue Cracks
Aug 31, 2018 MnDOT LRRB Cost-EffectiveTimber Bridge Designs for Long-Term Performance
Jun 30, 2018 Investigation of the Causes of Transverse Bridge Deck Cracking
Jun 30, 2018 Cost-Competitive Timber Bridge Designs for Long-Term Performance
Jun 30, 2018 Investigation of the Causes of Transverse Bridge Deck Cracking
Jun 15, 2018 Buchanan County Smart Timber GRS Abutment Bridge
Apr 29, 2018 Extended Life Concrete Bridge Decks Utilizing Improved Internal Curing to Reduce Cracking
Feb 28, 2018 Assessing Bridge Characteristics for Use and Importance as Roosting Habitats for Bats
Dec 31, 2017 Testing, Performance Evaluation, and Documentation of the Little Silver Creek Bridge: An Accelerated Innovation Deployment (AID) Project using Accelerated Bridge Construction
Dec 31, 2017 Investigation into Shrinkage of High Performance Concrete Used for Iowa Bridge Decks and Overlays - Phase II Shrinkage Control and Field Investigation
Dec 31, 2017 Development of a Rapid Assessment Tool for Pile Capacity and Stability in Response to Scour Situations
Dec 31, 2017 Rapid Bridge Deck Joint Repair Investigation - Phase III
Nov 30, 2017 Evaluation of the Metal Fatigue Solutions Electrochemical Fatigue Sensor System
Oct 31, 2017 Investigation and Evaluation of the Iowa Department of Transportation Bridge Deck Epoxy Injection Process
Jun 30, 2017 Development of a Structural Health Monitoring System to Evaluate Structural Capacity and Estimate Remaining Service Life for Bridges
Jun 30, 2017 Improved Analytical Techniques for Historic Covered Bridges-Phase II
Jun 30, 2017 Laboratory and Field Evaluation of a Composite Glue-Laminated Girder to Deck Connection
Jun 30, 2017 Development of a Structural Health Monitoring System to Evaluate Structural Capacity and Estimate Remaining Service Life for Bridges
May 31, 2017 Risk-Based Bridge Management: A Methodology to Assess and Incorporate Risk in Decision-Making
Apr 30, 2017 Validation Study for Detection and Quantification of Corrosion in Bridge Barrier Rails
Apr 30, 2017 Investigation of Glulam Girder Bridges with Composite Prefabricated Decks
Jan 31, 2017 Study of the Impacts of Implements of Husbandry on Iowa Bridges
Jan 31, 2017 Development of Rural Road Bridge Weigh-in-Motion System to Assess Weight and Configuration of Farm to Market Vehicles
Jan 31, 2017 Study of the Impacts of Implements of Husbandry on Iowa Bridges
Dec 31, 2016 Effect of Wind-Induced Unsteady Vortex Shedding, Diurnal Temperature Changes, and Transit Conditions on Truss Structures Supporting Large Highway Signs
Dec 31, 2016 Evaluation of the Bridge on Victor Avenue over Prairie Creek (Buchanan County IBRD Bridge Project)
Dec 31, 2016 Verification of LRFD Resistance Factors for Drilled Shafts Using Field Tests
Dec 31, 2016 Test Methods for LRFD Resistance Factors of Drilled Shafts
Dec 31, 2016 Design and Performance Verification of a Bridge Column/Footing/Pile System for Accelerated Bridge Construction (ABC)
Dec 31, 2016 Context-Sensitive Designs: Testing of Multi-Performance Level Box Beam Standards
Dec 29, 2016 LRFD Minimum Flexural Reinforcement Requirements
Nov 04, 2016 NCHRP Connection Details of Adjacent Precast Concrete Box Beam Bridges
Oct 31, 2016 Culvert Lateral Earth Pressure Sensors: Instrumentation of a Box Culvert During and After Construction
Oct 31, 2016 Integration of Structural Health Monitoring into Mulitlayer Statewide Bridge Maintenance and Management Practices
Sep 30, 2016 Economic Impact of Multi-Span, Pre-Stressed Concrete Girder Bridges Designed as Simple Span versus Continuous Span
Sep 30, 2016 Connection Details and Field Implementation of UHPC Piles - Phase II
Sep 30, 2016 Condition-Based Maintenance and Management of Aging Transportation Infrastructure
Sep 30, 2016 Condition Assessment Tools for Post-Tensioned Bridges
Aug 31, 2016 Optimizing Performance Characteristics of Steel Fiber-Reinforced Lightweight Concrete (SFRLWC) for Wearing Surface Application on Orthotropic Steel Decks
Jul 17, 2016 Evaluation of Performance of Innovative Bridges in Wisconsin
Jun 30, 2016 Bridge Design Effort and Cost Estimation Models - Phase I
Aug 31, 2015 Development of a Smart Timber Bridge-Phase V: Development of a Vehicle Characterization
Feb 12, 2015 Performance and Design of Bridge Approach Panels in Wisconsin
Jan 31, 2015 Development of a Smart Timber Bridge-Development of Data Processing Techniques for Determining Changes in Structural Stiffness
Dec 31, 2014 Seismic Performance of Connections that Facilitate Accelerated Bridge Construction
Jun 30, 2014 Work Plan for the Bridge Center and Bridge Engineer Program FY2014-Dynamic Sensor
Jun 30, 2014 An Investigation of a Suitable Shear Friction Interface between UHPC and Normal Strength Concrete for Bridge Deck Applications
May 31, 2014 SEISMIC: Development and Verification of Concrete Models for Pier Walls and Hollow Columns
Mar 31, 2014 Static Load Test of a Steel Pile at a Sand Site for Adopting a Higher Resistance Factor
Dec 31, 2012 Performance of Lightweight Foam Concrete Fill and Post-Grouted Drilled Shafts in Broadway Viaduct Replacement

 

2711 S. Loop Drive, Suite 4700, Ames, Iowa 50010-8664
Phone: 515-294-9501 ~ Fax: 515-294-0467
The Bridge Engineering Center is administered by Iowa State University's Institute for Transportation.

Bridge Engineering Center logo

Timber Bridge Program Structural Health Monitoring Completed Projects About BEC Staff Students Related Links

Iowa State University logo and link