| End Date | Title |
| Aug 30, 2010 |
Evaluation of a Bridge Constructed with Ultra High Performance Concrete |
| Jul 31, 2010 |
Implementation and Evaluation of Smart Timber Bridge Concepts to Provide Continuous Structural Condition Assessment |
| Jun 30, 2010 |
Evaluation of the 24th Street Bridge, Interstate 80/29, Council Bluffs, Iowa |
| Dec 31, 2009 |
Modified Sheet Pile Abutments for Low Volume Bridges (TR-568) |
| Apr 15, 2009 |
Testing and Long-Term Monitoring of 9th Street Bridge Over I-235 in Des Moines: Integral Abutments Supported on Steel Pile/Concrete Drilled Shaft in Glacial Clay |
| Dec 31, 2008 |
Effective Structural Concrete Repair |
| Oct 31, 2008 |
Construction and Evaluation of a Prestressed Concrete Bridge Constructed Using Ultra High-Performance Concrete |
| Sep 30, 2008 |
Madison County Bridge Evaluation |
| Sep 30, 2008 |
Evaluation of a Bridge Constructed Using Accelerated Construction Practices |
| Aug 31, 2008 |
Evaluation of FRP Temporary Bypass Bridge |
| Jun 30, 2008 |
Development of LRFD Design Procedures for Bridge Piles in Iowa (TR-573) |
| May 31, 2008 |
Feasibility Investigation of Segmentally Precast Bridge Piers for Accelerated Construction |
| May 31, 2008 |
Analyze Wind Loading Data Collected During Hurricane Katrina |
| Apr 30, 2008 |
Laboratory and Field Testing and Evaluation of Precast Bridge Elements |
| Dec 31, 2007 |
Instrumentation and Monitoring of Precast, Post-tensioned Bridge Approach Pavement |
| Oct 31, 2007 |
Field Evaluation of Timber Preservation Treatments for Iowa Highway Applications (IHRB-05-10) |
| Jun 30, 2007 |
Use of Ultra-High Performance Concrete in Geotechnical and Sub-structure Applications (TR-558) |
| Apr 30, 2007 |
Development of an Improved integral Abutment-to-Approach Slab Connection |
| Mar 31, 2007 |
Evaluation of a Timber Bridge for the Secondary Road System Using FRP Reinforced Glulam Girders |
| Dec 31, 2006 |
Evaluation of a Single-Span Steel-Girder Bridge Using a Steel-Free Deck System in Tama County |
| Dec 31, 2006 |
Short-Term Monitoring of the Saylorville Reservoir Bridge for Wind-Induced Vibrations with Remote, Cellular-Based Notification |
| Dec 31, 2006 |
Evaluation of a Prestressed Concrete Bridge Constructed using Ultra High-Performance Concrete |
| Jul 31, 2006 |
Field Testing of Railroad Flat Car Bridges |
| Apr 30, 2006 |
Performance Evaluation of Steel Bridges, Phase II (TR-493) |
| Feb 28, 2006 |
Evaluation of a Three-Span, Prestressed Concrete Girder Bridge Constructed with FRP Components |
| Dec 31, 2005 |
Monitoring Wind-Induced Vibrations/Stresses in a High Mast Lighting Tower (TR-518) |
| Sep 30, 2005 |
Enhancement of Wisconsin DOT NDE Capabilities |
| Sep 30, 2005 |
Remote Monitoring of Historic Covered Timber Bridges in Madison County for the Prevention of Arson and Vandalism |
| Sep 30, 2005 |
Development and Implementation of Design Recommendations for the Minimization of Timber Deck Panel Differential Deflection |
| Aug 31, 2005 |
Evaluation of a Steel Girder Bridge Strengthened Using Fiber Reinforced Polymer Plates |
| Dec 31, 2004 |
Development of Acceptable Live Load Deflection Criteria for Various Timber Superstructure and Deck Types |
| Dec 31, 2004 |
Evaluation of the Effectiveness of Glued Laminated Helper Stringers |
2711 S. Loop Drive, Suite 4700, Ames, Iowa 50010-8664
Phone: 515-294-9501 ~ Fax: 515-294-0467
The Bridge Engineering Center is administered by Iowa State University's Center
for Transportation Research and Education.
Copyright
© 2007–2008, Iowa State University. All rights reserved.