Current Projects--Bridge Engineering Center, Iowa State University
Current Projects divider

See also presentations given by BEC staff and students.

End DateTitle
Nov 30, 2018 Laboratory and Field Evaluation of an Alternative UHPC Mix and an Associated UHPC Bridge
Feb 28, 2018 Assessing Bridge Characteristics for Use and Importance as Roosting Habitats for Bats
Dec 31, 2017 Testing, Performance Evaluation, and Documentation of the Little Silver Creek Bridge: An Accelerated Innovation Deployment (AID) Project using Accelerated Bridge Construction
Jun 30, 2017 Improved Analytical Techniques for Historic Covered Bridges-Phase II
Dec 31, 2016 Evaluation of the Bridge on Victor Avenue over Prairie Creek (Buchanan County IBRD Bridge Project)
Dec 31, 2016 Effect of Wind Induced Unsteady Vortex Shedding, Diurnal Temperature Changes, and Transit Conditions on Truss Structures Supporting Large Highway Signs
Dec 29, 2016 LRFD Minimum Flexural Reinforcement Requirements
Nov 04, 2016 Connection Details of Adjacent Precast Concrete Box Beam Bridges
Jun 30, 2016 Investigation of the Causes of Transverse Bridge Deck Cracking
Jun 30, 2016 Economic Impact of Multi-Span, Pre-Stressed Concrete Girder Bridges Designed as Simple Span versus Continuous Span
Jun 30, 2016 Evaluation and Testing of a Light-Weight Fine Aggregate Concrete Bridge Deck in Buchanan County, Iowa
May 31, 2016 Risk-Based Bridge Management: A Methodology to Assess and Incorporate Risk in Decision-Making
May 31, 2016 Design and Performance Verification of a Bridge Column/Footing/Pile System for Accelerated Bridge Construction (ABC)
May 31, 2016 Study of the Impacts of Implements of Husbandry on Iowa Bridges
Apr 30, 2016 Development of Rural Road Bridge Weigh-in-Motion System to Assess Weight and Configuration of Farm to Market Vehicles
Mar 31, 2016 Investigation of the Effect of Speed on Dynamic Impact Factor for Bridges with Different Entrance Conditions
Mar 30, 2016 Integration of Structural Health Monitoring into Mulitlayer Statewide Bridge Maintenance and Management Practices
Feb 16, 2016 Evaluation of Performance of Innovative Bridges in Wisconsin
Jan 31, 2016 Investigation of the Impact of Dual Lane Axle Spacing on Lateral Load Distribution
Dec 31, 2015 Upgrading Bridge Rails on Low Volume Roads in Iowa
Dec 31, 2015 Investigation of the High Strength Bolt Tightening Verification Techniques
Dec 31, 2015 Terrestrial Laser Scanning-Based Bridge Structural Condition Assessment
Sep 30, 2015 Development of Cost-Effective Timber Bridge Repair Techniques for Minnesota
Sep 30, 2015 Evaluation of the Need for Longitudinal Median Joints in Bridge Decks on Dual Structures
Aug 31, 2015 Investigation of Negative Moment Reinforcing in Bridge Decks
Aug 31, 2015 Development of a Smart Timber Bridge-Phase V: Development of a Vehicle Characterization
Jul 31, 2015 Connection Details and Field Implementation of UHPC Piles - Phase II
Jul 31, 2015 Rapid Bridge Deck Joint Repair Investigation - Phase II
Jun 30, 2015 Iowa ABC Connections - Working Standards and Design Examples
Jun 30, 2015 Laboratory Investigation of Grouted Coupler Connection Details for ABC Bridge Projects
Jun 30, 2015 Iowa ABC Connections
May 31, 2015 Improving Accuracy of the Deflection and Camber Predictions for Prestressed Concrete Bridge Girders
May 31, 2015 Laboratory Investigation of Concrete Beam End Treatments
Apr 30, 2015 Implementation of a Pilot Continuous Monitoring System: Iowa Falls Arch Bridge
Feb 12, 2015 Performance and Design of Bridge Approach Panels in Wisconsin
Jun 30, 2011 Preservation of Covered Bridges
Aug 01, 2010 Field Evaluation of Methods to Minimize Transverse Glulam Deck Deflection, Phase 2

 

2711 S. Loop Drive, Suite 4700, Ames, Iowa 50010-8664
Phone: 515-294-9501 ~ Fax: 515-294-0467
The Bridge Engineering Center is administered by Iowa State University's Institute for Transportation.

Bridge Engineering Center logo

Timber Bridge Program Structural Health Monitoring Completed Projects About BEC Staff Students Related Links

Iowa State University logo and link