Evaluation of a Three-Span, Prestressed Concrete Girder Bridge Constructed with FRP Components

Researcher(s)

Principal investigator: Terry Wipf, 515-294-9501, tjwipf@iastate.edu (project list)

Co-principal investigators:

Project status

Completed

Start date: 03/01/03
End date: 02/28/06

Sponsor(s)/partner(s)

Sponsor(s):City of Bettendorf, Iowa

About the research

Abstract:

The accelerated deterioration of steel and concrete bridges has caused significant problems in the management and maintenance of the highway infrastructure. To date there have been relatively few in-service vehicular bridges constructed and monitored. While the potential exists for durable bridges to be built from FRP, their performance can only be evaluated through a series of monitoring programs. This proposal to the City of Bettendorf is to allow the transfer of the monitoring/evaluation portion of the IBRC Program funding to Iowa State University to perform these tasks.

2711 S. Loop Drive, Suite 4700, Ames, Iowa 50010-8664
Phone: 515-294-9501 ~ Fax: 515-294-0467
The Bridge Engineering Center is administered by Iowa State University's Institute for Transportation.

Bridge Engineering Center logo

Timber Bridge Program Structural Health Monitoring Current Projects Completed Projects About BEC Staff Students Related Links

Iowa State University logo and link