Testing and Long-Term Monitoring of 9th Street Bridge Over I-235 in Des Moines: Integral Abutments Supported on Steel Pile/Concrete Drilled Shaft in Glacial Clay Testing and Long-Term Monitoring of 9th Street Bridge Over I-235 in Des Moines: Integral Abutments Supported on Steel Pile/Concrete Drilled Shaft in Glacial Clay

Research Project

divider

Testing and Long-Term Monitoring of 9th Street Bridge Over I-235 in Des Moines: Integral Abutments Supported on Steel Pile/Concrete Drilled Shaft in Glacial Clay

Researcher(s)

Principal investigator: Brent Phares, 515-294-5879, bphares@iastate.edu (project list)

Co-principal investigators:

Project status

Completed

Start date: 04/15/06
End date: 04/30/10

Sponsor(s)/partner(s)

Sponsor(s):Iowa Department of Transportation

About the research

Abstract:

The 9th Street Bridge in Des Moines is the first bridge in Iowa that uses a unique integral abutment design. The integral abutments are supported on steel H-piles that are embedded into concrete drilled shafts, which are seated in glacial clay. This unique design was developed in an effort to address environemental concerns--namely vibrations from pile driving--while also providing a long-lasting stucture in the form of a jointless bridge. Although this innovative work is promising, it is unproven and will not become a common option unless adequate testing and monitoring are performed to validate design and behavior assumptions. A total of three pile/shaft elements will be instrumented and monitored over a minimum two-year period.

2711 S. Loop Drive, Suite 4700, Ames, Iowa 50010-8664
Phone: 515-294-9501 ~ Fax: 515-294-0467
The Bridge Engineering Center is administered by Iowa State University's Institute for Transportation.

Bridge Engineering Center logo

Timber Bridge Program Structural Health Monitoring Current Projects Completed Projects About BEC Staff Students Related Links

Iowa State University logo and link