Wind Monitoring of the Red Rock Reservoir Bridge for Wind Induced Vibrations with Remote, Cellular-Based Notification

Research Project

divider

Wind Monitoring of the Red Rock Reservoir Bridge for Wind Induced Vibrations with Remote, Cellular-Based Notification

Researcher(s)

Principal investigator: Brent Phares, 515-294-5879, bphares@iastate.edu (project list)

Project status

In progress

Start date: 02/01/09
End date: 07/31/10

Sponsor(s)/partner(s)

Sponsor(s):Iowa Department of Transportation

About the research

Research objective: During a high wind event in January 2006, several motorists reported movements of the bridge superstructure over the Saylorville Reservoir. Since then the Iowa DOT contracted with the Iowa State Univesity Bridge Engineering Center to design and install a monitoring system capable of providing notification of the occurrence of subsequent high wind events. That system is currently running and the process associated with reacting to high wind events appears to be working.

This project will include installation on the the Red Rock Reservoir Bridge a data collection system similar to the one installed on the Saylorville Reservoir bridge. It will monitor wind speed and direction and provide notification to DOT personnel when preset thresholds have been reached.

2711 S. Loop Drive, Suite 4700, Ames, Iowa 50010-8664
Phone: 515-294-9501 ~ Fax: 515-294-0467
The Bridge Engineering Center is administered by Iowa State University's Institute for Transportation.

Bridge Engineering Center logo

Timber Bridge Program Structural Health Monitoring Current Projects Completed Projects About BEC Staff Students Related Links

Iowa State University logo and link